Considerate Welbro in Hemel Hempstead PDF Print E-mail
BservCCS

 

 

**Stop Press - Welbro's second Considerate Constructors Scheme Inspection at Hemel Scores Record Score of 35 points for a B-serv Project. To See Full Report Click Here** 

Welbro have begun their first project under the Considerate Constructors Scheme for Brixton Plc at one of their customers premises in Hemel Hempstead. Welbro are renewing the roof coverings on this building but operations inside it can not be interupted in any way and water entering the building would have disasterous concequences, so it is necessary to erect a large temporary over-roof formed from scaffolding.

This page will keep you informed of the progress of the job via regular progress reports produced by the Project Manager James Sprack. These are listed below.

 

A huge scaffolding frame has been erected over the roof that will be covered with a strong fabric to protect the working area from the English summer weather as the work progresses. The scaffolding over roof has been erected by specialist scaffolding contractor Globe Scaffold.Scaffolding Frame

Globe Scaffolding are based in Wimbledon and were selected for this project because of thier extensive experience in complex large scale scaffolding projects.

The over roof is a major element of this project and needs to be in place before the old roof coverings can be removed.

 

 

Here are some more pictures of the scaffolding over roof frame as it was erected.

 



 Plan of Over roof


 Frame 2

The site manager is James Sprack and he prepares progress reports for this project on a regular basis. This project as also bee assessed under the Considerate Constructors Scheme so we have decided to publish his reports and assessments so that you can follow the progress of the job and have an insight to what running a large scale project is like.

 We will also publish more photographas as they become available

 

 

 

 

 

inside

 

 

 

The over roof, now complete provides protection from rain and poor weather whilst the re-roofing works are carried out below.

Unfortunately, during the current heatwave it has been getting too hot to work safely under the cover of the over-roof in the middle and late afternoons.

View the latest progress report to see what has been happening on site.

 

 

 

 

Complete

 Roofing complete and Scaffolding overroof is carefully dismantled.

 

 

 

 

 

 

 

 

 

 

Roof

New roof covering installed with safety line system for future roof maintenance without scaffolding.

 

 

 

 

 

 

 

 

 

Considerate Contractors Scheme Report

Considerate Contractors Scheme Scoring System

Progress Report 6

Progress Report 5

Progress Report 4

Progress Report 3

Progress Report 2

Progress Report1
 

Contact Us

Address:
71 St Margarets Lane   
Titchfield
Hampshire
PO14 4BG 
England
Tel: +44 1329 846076
Fax: +44 1329 846077
Email: webmaster@welbro.co.uk

Welbro Project Management Limited on LinkedIn Facebook LinkFacebook



Environmental Services

Sustainable Roofing
Asbestos Removals
Asbestos Disposal
Asbestos Surveys
Asbestos Roof
Solarwall TM
Terrace Roof
Green Roof
Solar PV
Sedum
PV

Building Refurbishment

Commercial Roofing
Roofing Services
Steel Roofing
Corrugated Roofing
Metal Cladding
Wall Cladding
Cladding
Rainscreen
Replacement Windows
Industrial Doors
Flat Roofs

 

 

Maintenance & Repairs

Roofing Consultants
Rooflights
Gutter Cleaning & Lining
Industrial Door
Specialist Paint Spraying
Safety Lines
Steelwork
Steel Balustrade
Aluminium Fabrication
Metal Fabricators
Steel Beams 
Welbro Logo
Investors in People
NFRC Logo
CCS Award Logo